Magnet ID :     Calibration
Directory : S:\magdata\LCLS-II\Phase Shifter\Calibration\126Gcm_-By\Final Results\Stretched Wire
   
Date : 06-26-2018
Time : 11:59:47 - 13:04:45
Operator : VV
   
Project : DUMMY
Device Type : Phase Shifter
Run Number : 1
Data Type :
Run Comment : rewired; 126 Gauss*cm magnet (By negative)
   
gap I1Y I2Y I1X I2X
-
-132.0 0.5 (5)
-27.9 0.4 (5)
0.7 0.7 (5)
0.1 0.0 (2)

integral gap -02.00;+00.00 -01.00;+00.00 +00.00;+00.00 +01.00;+00.00 +02.00;+00.00
I1Y -
-133.4 1.4 (3)
-132.8 1.1 (3)
-133.9 0.9 (3)
-132.4 0.5 (3)
-133.0 1.0 (3)
I2Y -
-28.5 0.1 (2)
-28.6 0.3 (3)
-28.5 0.1 (3)
-28.4 0.6 (3)
-28.6 0.3 (3)
I1X -
0.5 0.3 (3)
-0.4 0.1 (2)
0.6 0.3 (2)
-0.4 0.1 (3)
-0.1 0.6 (2)
I2X -
0.3 0.2 (3)
-0.7 1.4 (3)
-0.6 1.4 (3)
-0.0 0.5 (3)
-0.9 1.2 (3)

integral gap +00.00;-02.00 +00.00;-01.00 +00.00;+00.00 +00.00;+01.00 +00.00;+02.00
I1Y -
-126.1 10.7 (3)
-132.4 1.0 (3)
-132.6 0.7 (3)
-131.9 0.6 (3)
-132.4 1.0 (3)
I2Y -
-23.7 1.9 (3)
-26.1 3.0 (2)
-24.2 1.6 (3)
-28.1 0.1 (2)
-24.9 1.4 (2)
I1X -
-0.0 1.0 (3)
-1.7 1.1 (3)
-0.2 1.0 (3)
-1.9 0.8 (3)
-1.3 0.9 (3)
I2X -
-0.2 0.2 (3)
-0.5 0.5 (3)
-0.4 0.5 (3)
-0.2 0.2 (3)
-0.6 0.4 (3)

   
Magnet ID :     Calibration
Directory : S:\magdata\LCLS-II\Phase Shifter\Calibration\126Gcm_-By\Final Results\Stretched Wire